The Postal Square reconstruction is one of the largest infrastructure projects in Kyiv during the recent years. The construction was carried out taking into account the structure high responsibility and the complexity of the construction site engineering and geological conditions. At the same time the following problems were addressed: ensuring the surrounding slopes shear deformations absence during the pit arrangement and the structure construction and operation; surrounding buildings integrity; preservation of the territory original hydrogeological regime; preservation of the underground monuments of history and architecture. Based on mathematical modeling of the designed complex and the construction site and upland area soil massifs, the design solutions for new buildings are substantiated and developed, taking into account measures to ensure the subway and existing buildings safety, as well as the groundwater flows regulation during construction and operation. The slope stability during its cutting by the new building pit is checked by calculations. Thus, due to the geotechnical calculations of the designed complex along with the soil massifs of the construction site and upland area, structures design solutions and new buildings construction methods are developed taking into account the green construction requirements, dense urban development, existing buildings around and groundwater flows during construction and operation stages.
Barla, M., Antolini, F., & Dao, S. [2014] Il monitoraggio delle frane in tempo reale. Strade e Autostrade, 107, 154–157.
Casagli, N., Catani, F., Del Ventisette, C., Luzi, G. [2010] Monitoring, prediction, and early warning using ground-based radar interferometry. Landslides, 7(3), 291–301.
Kaliukh, I., Berchun, Y. [2020] Four-Mode Model of Dynamics of Distributed Systems. J. of Automation and Information Sciences, 52 (2), 1-12.
Kaliukh, I., Dunin, V., Berchun, Y. [2018] Decreasing Service Life of Buildings Under Regular Explosion Loads. Cybernetics and Systems Analysis, 54, 948–956.
Kaliukh, Y., Vusatiuk, A. [2019] Factorization in Problems of Control and Dynamics of Lengthy Systems. Cybernetics and Systems Analysis, 55, 274-283
Kaliukh, I., Fareniuk, G., Trofymchuk, O., Fareniuk, I., Berchun, Y. [2019] Identification of defects in reinforced concrete piles based on multi-wave reflection. In: Derkowski W., Gwoździewicz P., Hojdys Ł., Krajewski P. (eds). Proc. fib Symp. 2019: Concrete – Innovations in Materials, Design and Structures, Fédération Internationale du Béton (fib) – International Federation for Structural Concrete, 991-998.
Kopeika, O., Tereshchenko, A. [2001] Wind-power transforming systems. Journal of Mathematical Sciences, 104(6), 1631–1634.
Matveev, I., Milavskyi, V., Kisil, A., Ishchenko, Yu. [2009] Buildings serviceability restoration and reconstruction in the Kyiv urban conditions. Proceedings of the 17th International Conference on Soil Mechanics and Geotechnical Engineering.
Slyusarenko, Y., Matveyev, I., Kisil, A., Ischenko, Y., Romanov, O., Kosheleva, N. [2015) Solution of the geotechnical problems of the Poshtova Square reconstruction in Kiev. The XVI European Conference on Soil Mechanics and Geotechnical Engineering: Geotechnical Engineering for Infrastructure and Development (ECSMGE 2015), Edinburgh, United Kingdom.
Slyusarenko, Y., Chervinskyy, Y., Karpenko, Y., Dvornik, S., Malikov, S., Rozenvasser, G., Lavshuk, I. [2013] Modern methods of geotechnical defense of buildings in the difficult geological conditions of Ukraine International Conference on Soil Mechanics and Geotechnical Engineering - 18th International Conference on Soil Mechanics and Geotechnical Engineering (Paris).
Vaniček, I., Jirasko, D., Vaniček, M. [2013] Geotechnical engineering and protection of environment and sustainable development. The 18th IC SMGE Challenges and Innovations in Geotechnics. Paris: Presses de I’ecole national des ponts et chaussees.